Tioga helped facilitate a first-of-its kind financing program ("the Morris Model") in which taxable bonds were issued to finance the solar program

Case Study: William G. Mennen Sports Arena

Contributed by | Tioga Energy

Challenge

Significantly reduce energy costs by implementing a non-traditional PPA model that would leverage availability of low-cost municipal funding and federal tax credits; find a solar developer to work within the uncommon financial structure

Solution

SurePath™ Solar power purchase agreement with Tioga Energy

Benefits

  • Reduce energy costs: price of electricity will be approximately 35% less than that of local utility
  • Eliminate ownership responsibilities: operation upkeep and poor performance issues avoided
  • Hedge against rising utility costs: low-cost, fixed priced energy supports better cash flow management
  • Create local green jobs: local/state economy sustained and community good will generated

Highlights

Tioga helped facilitate a first-of-its kind financing program (“the Morris Model”) in which taxable bonds were issued to finance the solar program

Project Summary

New Jersey’s Morris County wanted to implement a renewable energy program and recognized that it made sense to work through a private third-party PPA provider in order to take advantage of federal tax incentives. Due in part to the unfolding 2009 financial crises, however, the available financing was limited and relatively expensive, greatly reducing the overall cost savings the County believed it could achieve. Instead, the County proposed issuing a county-guaranteed bond to finance the project. Through this highly innovative program, which Tioga Energy helped refine and facilitate, Tioga will use the funds raised through the bond to build the project, repaying the bond using proceeds from the sale of electricity and environmental attributes (SRECs). Bond investors will have the additional security of the full faith and credit guaranty of Morris County. This structure allows Tioga to maintain the tax ownership of the investment and provides access to low cost of capital available in the public markets, by way of Morris County’s “AAA” credit rating.

The result is a 3.22 MW project pilot encompassing 14 local schools and five municipal buildings that will provide solar energy at 35% below the local utility cost with a combined cumulative savings of $3.8 million over 15 years. During that time, 51,500 megawatt-hours (MWh) of clean energy will be generated. The first system to get underway, at the William G. Mennen Sports Arena, has a generating capacity of 1.57 MW. Covering three rooftops pls elevated solar structures shading more than 500 parking spaces, it will produce 30% of the facility’s electricity.

“Tioga’s willingness to work with us to refine this financing structure was essential for the success of our pilot program. Together we developed an ingenious model for affordable solar energy that can serve as the blueprint

for other local governments.”

– William Chegwidden, Deputy Director, Morris County Freeholders

LOCATION

William G. Mennen Sports Arena

Morris County Park Commission

Morristown, NJ

EPC Partner

SunDurance Energy

South Plainfield, NJ

INSTALLATION TYPE

Rooftop and parking lot solar structures

SYSTEM SIZE

1.57 MW

SOLAR ARRAY

6838 Yingli 230 watt PV panels

STATUS

Operational

FIRST YEAR POWER GENERATION

1.8 Million kWh

30% of the Arena’s electricity produced by solar

ENVIRONMENTAL  BENEFITS

Annual CO2 reduction equivalency of 1.2 million vehicles miles not traveled

The content & opinions in this article are the author’s and do not necessarily represent the views of AltEnergyMag

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

S-5!® PVKIT™ 2.0 Solar Rooftop Solutions

S-5!® PVKIT™ 2.0 Solar Rooftop Solutions

The concept of combining PV arrays with standing seam metal roofing is growing-for good reasons. Metal roofs have a life expectancy of more than 40 years. Shouldn't the mounting system last as long? With S-5! zero-penetration attachment technology and PVKIT 2.0, the solarized metal roof is the most sustainable system available -and without compromising roof warranties! PVKIT 2.0 is the also the best solution for attaching PV modules directly to any exposed fastener metal roof.